Every machine, accounted for.

Tracking, maintenance and logistics for mixed heavy fleets, even off the grid.

A single red string line stretched across a desert valley, threading an excavator bucket, a service truck drawer, a lowboy chain, a fuel tank valve and a site trailer window.
Maintenance, dispatch, hauling and fuel are one line, so pull it tight once.

Fleet board

  • All jobs
  • Rio Rancho
  • Belen pit
  • Los Lunas
  • Moriarty

Sample fleet

EX-14WL-07AT-21DZ-03SS-12LT-09
Machines, jobs, engine hours and status
MachineJobHoursStatus
EX-14ExcavatorRio Rancho500.0Service due at 500 h
WL-07Wheel loaderBelen pit1,212.8Working
AT-21Articulated truckBelen pit3,380.6Working
DZ-03DozerLos Lunas2,044.1Idle 2 days
SS-12Skid steer, rentedRio Rancho211.4Off-rent Friday
LT-09Light towerMoriartyNo engineBattery 82%
  1. Mon 06:12Work order drafted500-hour service, filters and oil reserved
  2. Mon 06:13Held from dispatchNext move to Los Lunas waits for the shop
  3. Mon 06:20Lowboy bookedThursday 6:30, brings a rental in, takes EX-14 back

Heavy fleets here run five brands, work past the last cell tower and move machines every week. Gytix answers to no manufacturer, keeps recording offline and runs maintenance to fuel as one chain.

Our position, in writing on the Why Gytix page

Read the commitments
An excavator stands at the centre of a sundial of pale stones on a mesa top, its boom’s long shadow ending at a service truck with filters ready in its open drawer.
The machine’s own hours call the service before it breaks.

Example: one machine’s 500‑hour week

How the chain runs on a single excavator, from first signal to back at work.

  1. The hours add up

    Monday, 452 hours

    Excavator 14 passes 450 hours in Rio Rancho. The 500-hour work order opens with filters reserved.

  2. Dispatch knows first

    Tuesday, 471 hours

    Dispatch flags it before the next job, so the superintendent plans around a half-day service.

  3. The move is booked

    Wednesday, 489 hours

    One lowboy trip brings a rental in Thursday and carries 14 back to the yard.

  4. Back to work

    Friday, 496 hours

    Service done, the rental goes off-rent and fuel, parts and hours land on the right job.

Where our crews work

Field crews leave from Albuquerque and are scheduled by the week.

AreaTowns and corridors
Albuquerque metroRio Rancho, Bernalillo, Los Lunas, Belen, Moriarty
Permian BasinHobbs, Carlsbad, Artesia, Lovington, Midland, Odessa
Four CornersFarmington, Aztec, Bloomfield, Gallup, Cortez
Southern New MexicoLas Cruces, Santa Teresa, Deming, El Paso
ArizonaPhoenix, Tucson, Casa Grande, Globe, Safford

Bring us your fleet list

Send the spreadsheet you already keep. We reply within one business day with a walkthrough on your own machines.